Tools for achieving effective collaboration

These are the slides from a talk that Jon gave at the RICS / APM Project Leadership Conference on 28th March 2017. In this talk, Jon compares JCT with NEC3 (and 4), single with two stage tendering, and which contract strategies can be used to successfully incentivise the Parties to collaborate.

Download the tool

Risk register spreadsheet

This a spread sheet for the contractual Risk / Early Warning Register under the NEC Engineering & Construction Contract. The Project Manager should use it to manage and prioritise early warnings and the resulting actions as agreed at the risk reduction meeting. For further guidance, see section 3.6.3 in Jon Broome's NEC3 User’s Guide.

Download the tool

Response Storyboard Sheet

This Word sheet can be used as the starting point for developing a response to a question in bid or Invitation to Tender. Use it after reading Jon’s articles on ‘Work Winning’ which can be found here.

Download the tool

ECSC Proformas

These proformas were developed by Jon for the operation of the NEC3 Engineering and Construction Short Contract (ECSC) and should cover the vast majority, if not all, contractual communications. Use them as a starting point for how you want to operate the contract, so feel free to adapt.

Download the tool

ECSC Proforma tracking sheet

This Excel spreadsheet was developed by Jon and is for use with the ECSC Proformas as written, so might need adjusting if you adapt the Proformas.

Download the tool